• Ormiston Road Bridge
  • Ormiston Road Bridge
  • Ormiston Road Bridge
  • New Zealand’s first cable stayed traffic bridge linking Ormiston Road with Flat Bush town centre
  • Designed by Moller Architects in association with Beca
  • 70m-long steel box girder suspended from 2, 46m-high inclined tapering concrete pylons
  • 27m span includes 4 traffic lanes, 2 cycle lanes and footpaths on both sides
  • Elevates road above Otara Creek beyond 100 year flood plain