  • Project management of construction of 6 mooring piles on Tamaki River estuary providing 2 additional ferry berths to allow open access to ferry operators
  • Excavation removed 2,500m 3 of seabed to a maximum depth of 1.3m
  • Environmental and Construction Management Plan required piles to be drilled rather than driven to minimise vibration